
August 17, 2026
The long work of bringing Bay Beach back
Green Bay improved Bay Beach with public amenities and a $500,000 EPA green-infrastructure grant.
Read the updateCampaign Updates
Updates on the campaign, local events, and the city work that helps shape Green Bay’s future.

August 17, 2026
Green Bay improved Bay Beach with public amenities and a $500,000 EPA green-infrastructure grant.
Read the update →
August 17, 2026
Green Bay’s 44 neighborhood associations give residents a practical way to strengthen the places they call home.
Read the update →
August 17, 2026
Imperial Supplies moved 300 jobs to the Feld Building downtown, according to Green Bay’s 2018 State of the City.
Read the update →
August 17, 2026
Jim opposed a proposed 154,000-square-foot Walmart on Broadway because it did not fit the corridor’s direction.
Read the update →
August 17, 2026
Green Bay’s 2019 Shipyard plan paired public waterfront access with a $500,000 EPA cleanup grant.
Read the update →
August 17, 2026
During Jim Schmitt’s tenure, Green Bay connected downtown planning with housing, retail, and public riverfront space.
Read the update →
August 17, 2026
Green Bay’s public record should be more than a highlight reel. It should be available for residents to examine.
Read the update →
August 17, 2026
A historic downtown landmark reopened in 2019 after a $50 million public-private rehabilitation.
Read the update →